Consider an appeal of the administrative decision denying a request to vary from the requirement to install electrical facilities underground rather than overhead in the Whisper South Development.
 

JHughson

CoSM Members
Page 296 and 299 appear to be the same request. Page 297 and 300 are the same map. Same for 298 and 301.
Is this just an error or is there something missing?
 

COSM_Admin

Administrator
Staff member
Responses provided by Shaun Condor, Director of Engineering and Capital Improvement:
It’s not an error. It just appears that way since all files were combined into a single document. Pages 299-301 is the applicant’s appeal letter and 295-298 is the City’s response letter in which we included a copy of their letter in our response.
 