Response provided by Shaun Condor, Interim Director of Engineering:
So, are we going to acquire that CCN area from Crystal Clear? The CCN swap has already occurred and was approved back in the 2014. This new main is needed to finalize the details listed in the swap since the City does not already have infrastructure in this location. Although the swap occurred in 2014, the process of finalizing the swap has been lengthy and is ongoing. City and Crystal Clear staff have swapped most services from the 2014 swap using in-house crews; however, there are a handful of projects still needed to finalize this swap. This project is much larger and beyond the skill set of City in-house crews. It will require a set of engineered plans to be completed.
Do we have arrangements with Crystal Clear to take water from their main? Yes, the attached agreement allows Crystal Clear to provide water to these residents until the City can get this new main installed.