Response to CM Baker, provided by Kirk Abbott, Project Engineer:
You are correct that the master plan adoption was not held up. Attached is a memo from April regarding Engineering/CIP concerns about the level of effort required. Such an impact study would likely be beyond the City’s capability and would require assistance from additional entities.